The railway life, all but just a blur into the sunset, one mile at a time.
After spending a few hours testing the Oakville Subdivision between Snake and Burlington West, the Test Train prepares to make a run to Fort Erie and back before sundown.
The Test Train glides through MP 0.1 on the Dundas Subdivision on its way to test T2 on the Oakville Subdivision.
The Test Train backs down T3 at Snake while testing for defects. They will test T1 after crossing over at Burlington West.
The Test Train sits tied down at the Hamilton shops waiting for a crew to take it to Burlington and then off to Fort Erie and return.